Benefits

Building Owners

  • Saves time and costs on fabrication and erection
  • No onsite welding of the moment connections reduces labor and welding inspection costs
  • Replaceable Yield-Links allow for less costly repairs and shorter recovery times   

Designers

  • Accepted into AISC 358-16 and code listed in ICC-ES ESR-2802
  • Prequalified to be used in special and intermediate steel moment frames
  • Moment frames can be designed without beam bracing
  • Small restricted zone

General Contractors

  • No delays for field welding and welding inspection of the moment connections
  • Faster construction cycle and superstructure erection times
  • Small restricted zone for easier MEP coordination
  • Moment frames can be designed without beam bracing

Fabricators

  • All shop welds are allowed as fillet welds, providing a simple fabrication process to allow you to produce more tonnage
  • Bolted onsite erection accelerates the construction timeline
  • All connections use standard holes and slots